Uruguai com 98% de eletricidade renovável

Publicação comentadaPost de Yoann Berno: “Uruguay shows what can happen when a country treats the energy transition as a long-term…” Ver o post completo na publicação da Linus ↗

O Uruguai virou referência de transição na América Latina. Em vídeo do Fórum Econômico Mundial repostado por Yoann Berno, o país aparece com 98% da eletricidade vinda de eólica, solar, biomassa e hidrelétrica, cerca de 50 parques eólicos e aproximadamente 50 mil empregos verdes, numa virada iniciada em 2008.

A matriz renovável também tem anos difíceis. Em fevereiro de 2023, em meio à seca, a ADME registrou importações da Argentina e do Brasil acima de 50% do suprimento, segundo a MercoPress. Num dia de demanda de 1.526 MW, o país importou 34% do Brasil, gerou 49% com eólica e 7% com térmicas.

A interligação com os vizinhos absorveu o risco hidrológico, porque operar térmicas a diesel saía mais caro, segundo a reportagem.

A lição do Uruguai inclui o plano de longo prazo e também a rede de apoio para o ano seco. Renovável com interligação é a combinação que sustenta a transição quando a chuva falta.

English version

Uruguay has become a transition benchmark in Latin America. In a World Economic Forum video reposted by Yoann Berno, the country appears with 98% of its electricity from wind, solar, biomass and hydropower, around 50 wind farms and about 50,000 green jobs, in a shift that began in 2008.

A renewable mix also has hard years. In February 2023, amid drought, ADME recorded imports from Argentina and Brazil above 50% of supply, according to MercoPress. On a day with 1,526 MW of demand, the country imported 34% from Brazil, generated 49% from wind and 7% from thermal plants.

Interconnection with neighbours absorbed the hydrological risk, because running diesel thermal plants was more expensive, according to the report.

Uruguay's lesson includes long term planning and also the backup network for a dry year. Renewables with interconnection are the combination that sustains the transition when rain fails.

FontesMercoPress, Uruguay importing over 50% of its electricity, 23/02/2023, https://lnkd.in/dr2UPQb4