Nº123
Uruguay: 500 to 600 MW of new solar tenders
English version in preparation. Summary of the original analysis, in Portuguese.
Anúncio uruguaio relatado pela ABSOLAR, ancorado na pv magazine Latinoamérica de 29 de julho de 2026: 500 MW renováveis até fevereiro de 2030 e 339 MW fotovoltaicos conectados no fim de 2025.
Original post. This analysis was published on the Linus Green Energy page on LinkedIn. Open on LinkedIn ↗
