Nº425
Neoenergia's hydrogen station in Brasília: R$ 30 million in R&D and the operating data
Renaldo Santos shared a video recorded at Neoenergia's green hydrogen plant near Brasília: containerised electrolysis, high pressure cylinders and refuelling at 350 bar for buses and at 700 bar for a fuel cell Honda CR-V. The text talks about Piauí; the video, about the Federal District.
According to Cenário Energia, on 27/11/2025, the station is part of an R&D programme regulated by ANEEL, worth more than R$ 30 million, and the partnership with Honda provides for six months of testing. On 26/03/2026, Iberdrola reported that the Taguatinga station began refuelling the country's first commercial hydrogen bus.
This design defines who absorbs the risk. As research, the plant does not depend on a hydrogen sales contract, and the product is information: operating cost, station availability, vehicle performance. If the cost assumption fails, the loss stays with the R&D programme.
The video captures the tension: solar energy is clean, the infrastructure is expensive. What Brasília measures on cost per kilogram should guide the Northeast before scale. Operating data is worth more than projections.
Translated from the Portuguese original published by Linus Green Energy.
SourcesCenário Energia, Neoenergia e Honda firmam parceria para acelerar uso do hidrogênio verde na mobilidade brasileira, 27/11/2025, https://cenarioenergia.com.br/2025/11/27/neoenergia-e-honda-firmam-parceria-para-acelerar-uso-do-hidrogenio-verde-na-mobilidade-brasileira/ | Iberdrola, primeiro ônibus comercial de hidrogênio verde do país, 26/03/2026, https://www.iberdrola.com/sala-comunicacao/noticia/detalhe/iberdrola-impulsiona-a-mobilidade-sustentavel-no-brasil-com-o-primeiro-onibus-comercial-de-hidrogenio-verde-do-pais
