
The first co-located BESS is only the beginning
Statkraft's Sol de Brotas 7 project, in Uibaí, Bahia, was authorized to add a 1.25 MW, 5.016 MWh BESS.

Statkraft's Sol de Brotas 7 project, in Uibaí, Bahia, was authorized to add a 1.25 MW, 5.016 MWh BESS.